Siemens SINAMICS G120D Operating Instructions Manual page 215

Distributed inverter cu240d-2 control unit with encoder evaluation
Hide thumbs Also See for SINAMICS G120D:
Table of Contents

Advertisement

Changing the ramp-up and ramp-down times in operation
The ramping up and down time of the ramp-function generator can be changed during
operation. The scaling value can come, e.g. from the fieldbus.
Requirements
• You have commissioned the communication between the converter and the control system.
• Free telegram 999 has been set in the converter and in your higher-level control system.
• The control sends the scaling value to the converter in PZD 3.
Procedure
1. Set p1138 = 2050[2].
This means that you have interconnected the scaling factor for the ramp-up time with PZD
receive word 3.
2. Set p1139 = 2050[2].
This means that you have interconnected the scaling factor for the ramp-down time with PZD
receive word 3.
The converter receives the value for scaling the ramp-up and ramp-down times via PZD receive
word 3.
Further information is provided on the Internet:
Application example
In the following application example, the higher-level control sets the ramp-up and ramp-down
times of the converter via PROFIBUS.
Figure 8-36
Converter with the control units CU240D-2
Operating Instructions, 10/2020, FW V4.7 SP13, A5E34262100B AH
Expanding or freely interconnecting telegrams (Page 153)
FAQ (https://support.industry.siemens.com/cs/ww/en/view/82604741)
Application example for changing the ramp-function generator times in operation
Advanced commissioning
8.14 Setpoint processing
213

Advertisement

Table of Contents
loading

Table of Contents