Failed Detector Check; Perform Qap - GE Definium AMX 700 Operator's Manual

X-ray system
Table of Contents

Advertisement

Figure A8-6 Detector Check results screen

Failed Detector Check

If the system fails the Detector Check (Figure A8-7), call to schedule service. The system is operational,
although inspection and potential calibration are needed.
WARNING:
Image quality may be degraded if you continue to use a detector that has failed the
Detector Check tests.
Figure A8-7 Failed Detector Check results

Perform QAP

QAP involves tests requiring exposures with the flat field phantom. The GE Portable DR Detector QAP kit
includes a flat-field phantom (Figure A8-8) sized to fit the collimator.
Definium AMX 700 X-Ray System
Operator Manual
Chapter A8: Quality Assurance Process and Maintenance
5161515-1EN
Rev. 6 (10 February 2008)
© 2008 General Electric Company. All rights reserved.
A8-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

5151481-35151481-4

Table of Contents