Installation summary
Device
connection
to CE on the
MGC *
* This is the recommended connection; however, you can connect to an external
switch.
Installation tasks
Table 3: List of required installation tasks
configuring a PRI Gateway.
Table 3: List of required installation tasks
Rack-mounting and grounding the PRI
Gateway
Installing the MGC card and DSP DBs
Installing an E1/T1 card and installing its
associated daughterboards
Connecting the components in a PRI
Gateway
Configuring the PRI Gateway, the MGC card,
and the DSP daughterboards
Configuring an E1/T1 card
26
Media Gateway 1000E PRI Gateway Installation and Commissioning
ELAN
ELAN
Address
port
requirement
subnet as the
MGC
Task
Comments? infodev@avaya.com
TLAN
TLAN
connection
port
on page 26 lists the tasks involved in installing and
See
Rack-mount and ground PRI Gateway
components
on page 53
Install a Media Gateway Controller and DSP
daughterboard
on page 55
Install an E1/T1 card and daughterboards
page 57
Connect PRI Gateway components
page 63
Configure the Media Gateway Controller and
DSP daughterboards in a PRI Gateway
page 69
Configure an E1/T1 card
Address
requirement
on
on
on
on page 81
March 2013