Avaya Communication Server 1000 Installation And Commissioning Manual page 127

Hide thumbs Also See for Communication Server 1000:
Table of Contents

Advertisement

2. To enable the PRI, enter:
3. To enable the DCHI (NTAK93AB), enter:
4. To enable the LAP protocols for each real and virtual channel configured on the
5. To check the status, enter:
Media Gateway 1000E PRI Gateway Installation and Commissioning
Figure 35: IDA startup
LD 75
ENL DDCS loop
The response is:
OK
LD 75
ENL DDSL n
The response is:
OK
STAT DDSL n
The response is:
ENBL IDLE (DCHI is enabled, but all channels are disabled.)
DPNSS1/DASS2 link, enter:
LD 75
STRT n
The response is:
OK, STARTING
The configured LAP protocols for each real and virtual channel configured on the
DPNSS1/DASS2 link are being enabled.
Both ends of the link should be started within five minutes of each other. When this
occurs, DTM301 is issued.
STAT DDSL n
The response is:
DPNSS/DASS startup and status check
March 2013
127

Advertisement

Table of Contents
loading

This manual is also suitable for:

Media gateway 1000e priMg 1000e pri

Table of Contents