Dual Cable Steering Bracket Kit Installation - Yamaha T8 Rigging Manual

Hide thumbs Also See for T8:
Table of Contents

Advertisement

Outboard Rigging Guide - 2001
DUAL CABLE STEERING BRACKET KIT
INSTALLATION (ABA-DUALS-TE-ER)
Please completely read and understand these
installation instructions prior to installation to
avoid damage to the outboard motor, boat or
accessory.
Kit Includes:
1
Steering Cable Mounting Bracket
1
Steering Cable Support Tube
2
Adjustment Nut
2
Locking Tab Washer
1
Bushing
1
Seal
1
Cable Connector
2
Self-locking Nut, 3/8"
2
Flat Washer, 3/8"
4
Bolt 6 x 15mm
NOTE: Both gear racks or rotary steering heads
must be installed so both steering cables will be
routed together on the same side of the boat and
will push-pull together. (See Illus. 1)
NOTE: This procedure is best done prior to bolt-
ing motor to the transom.

Dual Cable Steering Bracket Kit Installation

Steering Arm Installation
1. Install the steering arm to the motor tiller arm
using the inner (rearmost) bolt hole and
torque to specification. Be sure to use the
lock nut as shown in the Yamaha Rigging
Specs. (See Illus. 2 below) (See pg 7-26~7-
27 for assembly instructions.)
NUT
BOLT HEAD
STEERING LINK ROD
2. Assemble the cable connector onto the steer-
ing arm. Do not tighten at this time. (See
Illus. 3)
*Flat washers and lock nut come with the steering
link rod.
2-36
PIVOT BOLT AND BALL
JOINT CONNECTION
STEERING LINK ROD
CABLE CONNECTOR
FLAT WASHERS*
LOCK NUT*

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents