Yamaha T8 Rigging Manual page 379

Hide thumbs Also See for T8:
Table of Contents

Advertisement

Outboard Rigging Guide - 2001
5. Install the bushing and throttle control lever
into the throttle joint control, and secure it
with the nut flange.
3 Lever, Throttle Control
4 Bushing
5 Nut, Flange
6. Insert rod 1 into the hole in the shift joint con-
trol, fit the bushing, and install it on the bot-
tom cowling. Apply grease and install the
bushing and shift joint control from outside,
then secure it with the nut flange.
2 Lever, Shift Control
4 Bushing
5 Nut, Flange
6 Joint, Control
7 Rod 1
25HP Remote Control Attach. Kit
7. Install rod 1 on the shift rod link
loosen bolt
F
between shift rod link and crankcase, and
insert rod 1. 7 Rod 1.
N O T E :
For this operation, shift into Reverse and
fully open the throttle.
8. Slip the plate washers 9, respectively, over
rods 1 and 2, and lock each rod with the cot-
ter pin. Retighten bolt
in 7 above).
9. Connect the remote control cables to remote
control bracket 1. (Connect the shift cable
first.)
G
Shift Cable
H
Throttle Cable
N O T E :
Fit the groove in the cable over the recess
of the bracket and clamp the cable.
7-18
E
to allow a small amount of gap
F
(which was loosened
. Then,

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents