Chapter 3 Procedures Before Operation - Mitsubishi Electric MELSEC iQ-F Series User Manual

Programmable controller
Hide thumbs Also See for MELSEC iQ-F Series:
Table of Contents

Advertisement

3
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Checking the specifications of the Ethernet module
Check the specifications of the Ethernet module. ( Page 14 SPECIFICATIONS)
 MELSEC iQ-F FX5-ENET User's Manual
 MELSEC iQ-F FX5-ENET/IP User's Manual
2.
Mounting the Ethernet module
Mount the Ethernet module to the FX5 CPU module. For details, refer to the following.
 MELSEC iQ-F FX5UJ User's Manual (Hardware)
 MELSEC iQ-F FX5U User's Manual (Hardware)
 MELSEC iQ-F FX5UC User's Manual (Hardware)
3.
Configuring a network
Configure the system and set the parameters which are required for startup.
• Wiring ( MELSEC iQ-F FX5-ENET User's Manual,  MELSEC iQ-F FX5-ENET/IP User's Manual)
• Parameter setting ( Page 51 PARAMETER SETTINGS)
4.
Network diagnostics
Check the network status with the Ethernet diagnostics.
For details, refer to the following.
 MELSEC iQ-F FX5-ENET User's Manual
 MELSEC iQ-F FX5-ENET/IP User's Manual
5.
Programming
Create a program. ( Page 63 PROGRAMMING)
6.
Checking the communication status
Check the communication status of the Ethernet module. ( MELSEC iQ-F FX5-ENET User's Manual,  MELSEC iQ-F
FX5-ENET/IP User's Manual)
3 PROCEDURES BEFORE OPERATION
3
17

Advertisement

Table of Contents
loading

Table of Contents