Installing the Chassis

IN THIS CHAPTER

Before You Install the CTP2000 Platform | 90

Installing the CTP2000 Platform in Freestanding Mode | 91
Special Guidelines for Installing CTP2056 Chassis in a Rack | 91
Installing the CTP2000 Platform in a Rack | 92
Before You Install the CTP2000 Platform
Before installing the platform:
Refer to the platform specifications for the particular CTP model or series.
Have a plan for installing the device that takes into consideration future expansion.
Have the tools and accessories needed to complete the installation.
Read and understand the clearance requirements for the front and back of the chassis for cable routing
and other unit access.
Read and understand the clearance requirements for the top and bottom of the chassis to ensure adequate
ventilation.
Prepare the equipment racks by measuring and marking space for each device and plenum you plan to
install.
RELATED DOCUMENTATION
Installing the CTP2000 Platform in Freestanding Mode | 91
Installing the CTP2000 Platform in a Rack | 92
See"CTP2000 Environmental Requirements" on page 40
for more information.