Unpacking The Cabinets; Tools Required - Siemens SINAMICS S120 Manual

Cabinet modules
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Removing the shipping and handling indicators prior to commissioning
NOTICE
Removing the shipping and handling indicators prior to commissioning
The shipping and handling indicators must be removed before commissioning the
converter.
If this is not observed, the transport indicators can cause damage in the unit when the
converter is operated.
Ethyl alcohol can be used to remove any remains of adhesive after removing the transport
indicators from the control cabinet.
3.3.2.4

Unpacking the cabinets

The packaging material must be discarded in accordance with the applicable country-specific
guidelines and rules.
3.3.2.5

Tools required

To install the connections, you will need:
● Spanner or socket spanner (width across flats 10)
● Spanner or socket spanner (width across flats 13)
● Spanner or socket spanner (width across flats 16/17)
● Spanner or socket spanner (width across flats 18/19)
● Hexagon-socket spanner (size 8)
● Torque wrench
● Screwdriver (size 2)
● Screwdriver Torx T20 / T25 / T30
A socket-spanner case with two long extensions is recommended.
Cabinet Modules
Manual, 03/2013, A5E03263538A
Mechanical installation
3.3 Installation
53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents