4.6.12.2
Cable routing for Line Connection Modules
For the Line Connection Modules, the customer must carry out the following cabling or
connection work:
Table 4- 14
Cable routing
Cable for the line supply connection (L1, L2, L3, PE)
Signal cables
Notice:
The "Basic rules for cable routing" and "Preparatory steps" described above must
be observed whenever any cabling or connection work is performed!
Cabinet Modules
Manual, 03/2013, A5E03263538A
Checklist for cabling or connection work for Line Connection Modules
Electrical installation
4.6 Connections
Completed?
109