Suzuki DR-Z70 Service Manual page 114

Table of Contents

Advertisement

• Install the throttle valve 4 to the carburetor.
Align the slit B of the throttle valve 4 with the projec-
tion C on the carburetor body.
• Install the O-rings 5 .
• Apply SUZUKI SUPER GREASE "A" to the O-rings 5 .
99000-25010: SUZUKI SUPER GREASE "A"
The removed O-rings must be replaced with new ones.
• Tighten the intake pipe clamp screw 6 .
• Tighten the carburetor mounting bolts 7 to the specified
torque.
Carburetor mounting bolt: 10 N·m (1.0 kgf-m, 7.0 lb-ft)
• After remounting the carburetor, perform the following:
* Install the fuel hose. ..................................
* Check for fuel leakage.
* Engine idle r/min adjustment .....................
* Throttle cable play adjustment ..................
or equivalent
7-15
2-11
2-11
FUEL SYSTEM
4-12

Advertisement

Table of Contents
loading

Table of Contents