Test Setup
O
M
N-65 Service Manual
XI
AX
You must complete Test Setup before performing any other pulse oximetry
functional tests.
To perform test setup:
1. Press the Power button to turn on the monitor.
2. After the monitor presents the monitoring screen, connect the SRC-MAX
tester to the monitor sensor port as shown.
Note: Use a DEC-4 extension cable between the SRC-MAX and the
monitor.
The SRC-MAX panel lights and in a few seconds the monitor tracks the
simulator.
After the monitor completes POST, the monitor:
•
is in SpO
alarm
2
•
displays an %SpO
•
displays a pulse rate of 60 (pass criteria is 57 to 63 bpm inclusive)
1 — Sensor Port
of 75 (pass criteria is 73 to 77 %SpO
2
Performance Verification
inclusive)
2
31