Test 3: Modulation Level - Nellcor OxiMax N-65 Service Manual

Handheld
Hide thumbs Also See for OxiMax N-65:
Table of Contents

Advertisement

Performance Verification

Test 3: Modulation Level

34
2. Press the SRC-MAX %SpO
The SRC-MAX %SpO
The monitor displays two dashes until the SRC-MAX stabilizes at 75 %SpO
The test pass criteria is 73 to 77 %SpO
The monitor:
displays 75 %SpO
displays 60 bpm
alarms
Pulse Amplitude indicator displays low level modulation
To perform Test 3: Modulation Level:
1. Press the SRC-MAX % Modulation selection button.
The SRC-MAX % Modulation
The monitor pulse blip bar initially increases in amplitude and then stabilizes
at the higher level.
The monitor:
displays 75 %SpO
displays 60 bpm (test pass criteria is 57 to 63 bpm inclusive)
alarms
Pulse Amplitude indicator displays high level modulation
select button.
2
75 LED lights.
2
inclusive.
2
(pass criteria is 73 to 77 %SpO
2
LED lights.
(test pass criteria is 73 to 77 %SpO
2
inclusive)
2
inclusive)
2
O
M
N-65 Service Manual
XI
AX
.
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents