KYMCO DINK 200i Service Manual page 373

Table of Contents

Advertisement

18
. IGNITION SYSTEM
DINK 125:
Turn the ignition switch to "ON" and engine
stop switch ON and side stand is up.
Connect the multimeter (+) probe to the
Black/Yellow wire and the multimeter (-) to
the body ground.
Check for initial voltage at this time.
The battery voltage should be measured.
If the initial voltage cannot be measured,
check the power supply circuit.
IGNITION PULSE GENERATOR
INSPECTION
Remove the luggage box (refer to the
"FRAME COVERS
REMOVAL/INSTALLATION" section in
the chapter 2).
Disconnect the ignition pulse generator
connector (1).
Measure the ignition pulse generator
resistance between the Green/White wire and
Blue/Yellow wire.
Standard:
DINK 200i: 16.4: (20ºC/68ºF)
DINK 125: 106: (20ºC/68ºF)
DINK 200i/125
18-6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dink 125

Table of Contents