Fig. 45: Assigning an available pocket program slot (2)
Information
Pocket programs highlighted in blue are already in use in other seam
sequences.
The currently selected pocket program is highlighted in orange.
3. Select the desired pocket program.
To scroll up and down the list of pocket programs, press the buttons
66
You can select no more pocket programs than there are available
pocket program slots (up to 8).
The order in which they are selected corresponds to the order of the
programs in the seam sequence.
and
.
Operating Instructions 745-35-10 D - 00.0 - 04/2017
Programming