Operation
Fig. 31: Inserting the reinforcement strip (4)
(5) - Guide
(6) - Reinforcement strip
10. Insert the reinforcement strip (6) into the feed device (11).
11. Transport the reinforcement strip (6) approx. 20 mm on the fabric sliding
12. Press the
The reinforcement strip (6) is cut to the correct length.
Information
The tape projection at seam beginning and seam end can be set in the
Program parameters menu item ( p. 101).
Operating Instructions 745-35-10 D - 00.0 - 04/2017
⑪
plate (8).
button.
⑦
(7) - Guide
(11) - Feed device
⑤
⑥
41