Step 2: Remove The Installation Equipment - Avaya G250 Installing And Upgrading

Hide thumbs Also See for G250:
Table of Contents

Advertisement

Note:
You must add the LSP server correctly to the Main CM Server.
Note:
2. If valid translations are not file synchronized to the LSP, do the following:
a. From a SAT session run from the primary controller, verify that the LSP node-name
and IP address are correctly entered.
b. Use the save translation lsp command to start the file synchronization process.
There may be a delay while the files are synchronized, especially during high network
traffic.
c. Log in again to Avaya Aura Communication Manager from the LSP and list either
stations or trunks.
d. Verify that the list of stations or trunks is valid.
3. Ensure that the green LED on the faceplate of the S8300 LSP is on.
4. Disconnect the G250 from the primary controller, ensuring that all telephones are still
connected to the G250.
5. Verify that calls can be made between local telephones and to outside telephones.
Note:
See also "Auto Fallback for H.248 Gateways" in Administering Network
Note:
Connectivity on Avaya Aura™ Communication Manager, 555-233-504 and the
Migrate H.248 MG to primary" screen command in Avaya Aura™ Communication
Manager Screen Reference, 03-602878.

Step 2: Remove the installation equipment

Remove all equipment that you used to assist you in the installation process. This may include
the CD-ROM drive, the software upgrade CDs, the laptop computer, and the modem (for
installations without an S8300X module only).
Note:
If you have an S8300X Server module installed in the G250, leave the modem
Note:
connected to enable reporting of alarms to remote locations.
Step 2: Remove the installation equipment
Issue 6 November 2009
61

Advertisement

Table of Contents
loading

Table of Contents