Chapter 6: After installation
After initial configuration, it is necessary to test the installation, and remove the installation
equipment.
Step 1: Test the installation
When the installation is complete, simple tests must be performed to test telephone and data
connectivity.
Testing data connectivity
Test data connectivity by pinging the IP address of each device to test the device's connectivity
within the network and outside the network.
Test local data connectivity on-site by checking that you can send an email between two PCs
that are connected to the G250.
Testing telephones
1. Make outgoing calls from the telephone. Make sure you hear a dial tone when you pick up
the receiver. Make sure you can make both an internal (station-to-station) call and an
external call to PSTN.
2. Make a station-to-station call and make a call to PSTN.
Testing trunks
Use the facility test call feature to verify that each trunk is functioning properly. For information
about how to use the facility test call feature, see Maintenance Procedures for Avaya Aura™
Communication Manager, Media Gateways and Servers, 03-300432.