Avaya G250 Installing And Upgrading page 99

Hide thumbs Also See for G250:
Table of Contents

Advertisement

Figure 16: G250 NVRAM INIT Jumper Location
Figure notes:
1. P25 - NVRAM INIT jumper
8. Replace the cover.
9. Reconnect the G250 to the electricity supply.
- The PWR LED on the front panel lights. The CPU LED lights up if the firmware is running.
10. Disconnect the power cord from the power receptacle on the rear panel of the G250.
11. Remove the cover of the G250.
12. Remove the bridge from the jumper.
!
Important:
If you do not remove the bridge, the G250 will continue to initialize the NVRAM
Important:
when it resets or is powered up.
13. Replace the cover of the G250.
1
Issue 6 November 2009
CLI is not accessible
99

Advertisement

Table of Contents
loading

Table of Contents