Alcatel-Lucent 1645 AMC Installation Manual page 143

Access multiplexer compact amc
Hide thumbs Also See for 1645 AMC:
Table of Contents

Advertisement

Stand-alone test procedures
...................................................................................................................................................................................................................................
Accessories
2x E1 cables
PDH BER test set with
E3 option
2x E3 cables
PDH BER test set with
DS1 option
2x DS1 cables,
refer to note 1
PDH BER test set with
DS3 option
2x DS3 cable,
refer to note 1
2x optical fibers,
single/multi mode
depending on the used
SFP
1x Ethernet CAT 5
crossed UTP cable
1x SHDSL cable
(see chapter 4, section
"SHDSL interfaces
(X12SHDSL-V2
card)" (p. 4-25)
SHDSL E1 modem
Note
Since the pulse shape for DS1 and DS3 signals is defined at the DDF, the cable length
between the port and the DDF must be compensated for each port output (Menu: Port
Provisioning, Cable length). By default the cable compensation is set to 0-131 feet (DS1)
or 0-120 feet (DS3). Because the PDH analyzer is connected close to the DDF, the
receiver will deal with the cable loss. However for each port the length between port and
DDF should be estimated and compensated by selecting the proper length range before
the other side is connected.
...................................................................................................................................................................................................................................
365-313-103R8.0
Issue 2 July 2009
1645 AMC with an option card
Option cards
E1
E3
DS1
X
X
X
X
X
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
DS3
STM-1
Optical
X
X
X
Test equipment and accessories
Trans
Trans
LAN
LAN
X8PL
X5IP
X
X
X
X12
SHDSL
X
X
7-3

Advertisement

Table of Contents
loading

Table of Contents