Download Print this page

Using This Manual (1) - Mitsubishi Electric AJ65BT-D75P2-S3 User Manual

Hide thumbs Also See for AJ65BT-D75P2-S3:

Advertisement

USING THIS MANUAL (2)
Chapter 1 PRODUCT OUTLINE
Chapter 2 SYSTEM CONFIGURATION
Chapter 3 SPECIFICATIONS AND
FUNCTIONS
Chapter 4 INSTALLATION, WIRING
AND MAINTENANCE OF
THE PRODUCT
Chapter 5 DATA USED FOR
POSITIONING CONTROL
5.1 Types of data
5.2 List of parameters
5.3 List of positioning data
5.4 List of start block data
5.5 List of condition data
5.6 List of monitor data
5.7 List of control data
Chapter 6
SEQUENCE PROGRAM USED
Chapter 7
MEMORY CONFIGURATION
AND DATA PROCESS
*Understand the data process in the D75P2 as necessary.
The methods for reading this manual are shown below.
1)  2)  3)  4)  5)  Test operation  6)  Actual operation
FOR POSITIONING CONTROL
1) Understand the product functions and specifications,
and design the system.
2) Install and wire the product
3) Set the parameters
4) While referring to lists in "SECTION 2" and "Chapter 5",
set the data required for each control
Chapter 8 ZERO POINT RETURN
CONTROL
Chapter 9 MAIN POSITIONING
CONTROL
Chapter 10
ADVANCED
POSITIONING CONTROL
Chapter 11 MANUAL CONTROL
Chapter 12 CONTROL AUXILIARY
FUNCTIONS
Chapter 13
COMMON FUNCTIONS
5) Create a sequence program for control
Chapter 14 TROUBLESHOOTING
6) Remedies for "Errors" and "Warnings"
A - 18

Advertisement

loading