Handling; Installation; Regulations For Installation; Mounting Location - Siemens RVA63.280 Basic Documentation

Boiler and heating circuit controllers
Table of Contents

Advertisement

1. Making the
connections
12/184
Siemens Building Technologies
Landis & Staefa Division
2

Handling

2.1

Installation

2.1.1

Regulations for installation

.
• Air circulation around the controller must be ensured, allowing the unit to emit the
heat produced by it.
A clearance of at least 10 mm must be provided for the controller's cooling slots
which are situated a the top and bottom of the housing.
The space should not be accessible and no objects should be placed there.
If the controller is enclosed in another closed (insulating) casing, a clearance of up to
100 mm must be observed on all sides
• The controller is designed conforming to the directives for safety class II mounted in
compliance with these regulations
• Power to the controller may be supplied only after it is completely fitted in the cut-out.
If this is not observed, there is a risk of electric shock hazard near the terminals and
through the cooling slots
• The controller may not be exposed to dripping water
• Permissible ambient temperature when mounted and when ready to
operate: 0...50 °C
2.1.2

Mounting location

• In the boiler front
• In the control panel front
2.1.3

Mounting procedure

• Turn off power supply
• Pull the prefabricated cables through
the cut-out
• Plug the connectors into the
respective sockets at the rear of the
controller
è
Note:
The connectors are coded to make
certain they cannot be mixed up.
Basic Dokumentation RVA63.280, RVA53.280
CE1P2374E
19.04.2001

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rva53.280

Table of Contents