Checks: Turbo Pressure; Pressure Gauge For Checking The Pressure; Pressure Take-Off Extension/Union And Hose; Sleeve For Checking The Turbo Pressure And Adaptor Sleeve - CITROEN C5 2005 Service Manual

Hide thumbs Also See for C5 2005:
Table of Contents

Advertisement

B1BP33PC
B1HP1ZEC

CHECKS: TURBO PRESSURE

[1] Pressure gauge for checking the pressure

[2] Pressure take-off extension
[3] Pressure take-off union and hose
[4] Sleeve for checking the turbo pressure
[5] Adaptor sleeve
Checks.
IMPERATIVE: Respect the safety and cleanliness specific to high pressure diesel injection engines.
Preliminary operations.
Slacken the clip (1).
Uncouple the air supply duct (2).
Fit tool [1] on tool [2].
Checking.
Insert the tools [4] and [5] between the air duct (2) and the turbo air cooler outlet at «a».
Fit the tool [3] on tool [4].
Position tool [1] inside the vehicle.
Start the engine.
Accelerate the engine to 4000 rpm.
The pressure should be
Returning the vehicle to conformity
Remove tools [1], [2], [3], [4] and [5].
Recouple the air duct (2) on the turbo air cooler.
Tighten the clip (1).
Engines: RHL - RHR
Tools.
: 7073-T
: 8607-T.A
: 8607-T.B
: 4185-T
: 4219-T
: 1 ± 0,2 bar.
195
C5

Advertisement

Table of Contents
loading

This manual is also suitable for:

C8 2005

Table of Contents