CITROEN C5 2005 Service Manual page 177

Hide thumbs Also See for C5 2005:
Table of Contents

Advertisement

CHECKING AND SETTING THE VALVE TIMING
C5
Engines: RHL - RHR
Refit tool [6].
Remove the auxiliaries drive pulley (7).
Refit the crankshaft position sensor target (10), the lower timing cover (9), the crankshaft position sensor (11),
the torque reaction rod on the lower engine support.
Take away the workshop hoist.
Coat the screw (8) with Loctite FRENETANCH.
Refit the auxiliaries drive pulley (7) and the screw (8) with its washer.
Tighten the screw (8) to 7 ± 0,7 m.daN, then angular tighten by A = 60° ± 5°.
Remove tools [2], [3] and [6].
Refit the upper timing cover (6).
Reposition the electrical harness (5).
Refit the RH engine support (4), the torque reaction rod (3).
Reclip the fuel supply and return pipes.
Connect the fuel supply pipe (1), the fuel return pipe (2).
Refit:
- The auxiliaries drive belt (see corresponding operation).
Complete the refitting.
B1EP1FLC
173

Advertisement

Table of Contents
loading

This manual is also suitable for:

C8 2005

Table of Contents