Yamaha RS90GTZ Service Manual page 469

Hide thumbs Also See for RS90GTZ:
Table of Contents

Advertisement

SPEC
CABLE ROUTING
Fasten the fuel hose and fuel
pump lead with the plastic band,
making sure to align the band
with the positioning tape on the
lead. Clearance between the
plastic band and fuel pump
should be 0 ~ 20 mm (0 ~ 0.79
in).
Insert the shorter L-shaped fuel
tank breather hose into the fuel
tank, and then point the longer
portion of the hose to right.
Face the catch of the hose
clamp to front.
To left handlebar switch
To parking brake lever
To speed sensor
Install the three relays at outer
side of the snowmobile. Put the
relays in any order.
Fuel injection system relay
Passenger grip warmer relay
(black)
Highlight relay (black)
Pass the parking brake cable,
throttle cable and corrugated
tube through the upper guide.
Make sure that cables and tube
are positioned in the order listed
from front to back.
To brake master cylinder
To auxiliary DC jack
Speed sensor coupler
Position the headlight sub-wire
harness coupler outermost of all
the other harnesses.
Connect the fuel sender cou-
pler, making sure that the cou-
pler is positioned under the fuel
hose.
After connecting the ignition
system sub-wire harness cou-
pler, slide the rubber cover over
it.
#1 mark
Fasten the wire harness and
ignition system sub-wire har-
ness to the frame cross mem-
ber with the plastic band. Point
the end of the plastic band rear-
ward.
9-36

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs90ltgtzRst90gtz

Table of Contents