Crankshaft; Starter Clutch (Dr-Z400E) - Suzuki drz 400E Service Manual

Table of Contents

Advertisement

3-36
ENGINE

CRANKSHAFT

CRANKSHAFT RUNOUT
Support the crankshaft using V-blocks and measure the crank-
shaft runout using the dial gauge, as shown. If the runout ex-
ceeds the service limit, replace the crankshaft with a new one.
09900-20606: Dial gauge (1/100 mm)
09900-20701: Magnetic stand
09910-21304: V-block set (100 mm)
Crankshaft runout
Service Limit: 0.08 mm (0.003 in)

STARTER CLUTCH (DR-Z400E)

Hold the rotor with a 26-mm offset wrench and remove the
hexagon bolts.
Install the starter clutch in the proper direction as shown.
NOTE:
When installing the starter clutch onto the rotor, make sure that
the notch A in the bearing faces to the rotor.
Apply engine oil to the starter clutch.
Apply THREAD LOCK SUPER "1303" to the hexagon bolts,
and then tighten them to the specified torque while holding
the rotor and using a 26-mm offset wrench.
99000-32030: THREAD LOCK SUPER "1303"
Starter clutch bolt: 26 N·m (2.6 kgf-m, 19.0 lb-ft)
Install the starter gear 1 to the starter clutch.
Check that the rotor 2 turns in the direction of the arrow 3
on the rotor while holding the starter gear, and that the rotor
never turns in the opposite direction of the arrow.
1
2
3

Advertisement

Table of Contents
loading

Table of Contents