Bfd For Pw Configuration Example - HP 6127xlg Configuration Manual

Blade switch series
Hide thumbs Also See for 6127xlg:
Table of Contents

Advertisement

Source IP: 1.1.1.9
Session State: Up
Template Name: -
The output shows that two BFD sessions have been established between Switch A and Switch C. One
session verifies the connectivity of the LSP from 3.3.3.9/32 to 1.1.1.9/32 and the other session verifies the
connectivity of the LSP from 1.1.1.9/32 to 3.3.3.9/32.

BFD for PW configuration example

Network requirements
Create two LDP PWs to implement PW redundancy between CE 1 and CE 2. The primary PW goes
through PE 1—PE 2. The backup PW goes through PE 1—PE 3. Configure BFD to inspect the connectivity
of the primary PW. When the primary PW fails, CE 1 and CE 2 communicate through the backup PW.
Figure 106 Network diagram
CE 1
Table 38 Interface and IP address assignment
Device
CE 1
PE 1
CE 2
Configuration procedure
Before you perform the following configurations, create VLANs on each switch and add ports to the
VLANs.
1.
Configure CE 1.
<CE1> system-view
[CE1] interface vlan-interface 10
Loop0
Vlan-int10
Vlan-int10
PE 1
MPLS or IP
backbone
Interface
IP address
Vlan-int10
100.1.1.1/24
Loop0
1.1.1.1/32
Vlan-int12
12.1.1.1/24
Vlan-int13
13.1.1.1/24
Vlan-int10
100.1.1.2/24
Destination IP: 127.0.0.1
Session Role: Passive
Loop0
Vlan-int12
Vlan-int12
Vlan-int13
PE 2
Loop0
Vlan-int13
PE 3
Device
PE 2
PE 3
426
Vlan-int10
Vlan-int10
CE 2
Vlan-int10
Interface
IP address
Loop0
2.2.2.2/32
Vlan-int12
12.1.1.2/24
Loop0
3.3.3.3/32
Vlan-int13
13.1.1.3/24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents