Chapter 3: Preparing For Installation; In This Chapter; Installation Overview; Introduction - Avaya CallPilot 1006r Hardware Installation

Table of Contents

Advertisement

Chapter 3: Preparing for installation

In this chapter

Installation overview

Unpacking the 1006r server
Installation overview

Introduction

This section provides an overview of the steps required to install the 1006r server and
peripheral devices.

Installation checklist

The following checklist identifies the tasks that must be performed when installing the Avaya
®
CallPilot
server. For detailed instructions, see
are finished with the installation, continue with the Installation and Configuration Task List
(NN44200-306).
Note:
If you are installing a High Availability system, follow this checklist for each server, with the
exceptions listed on
Step
1
Avaya CallPilot® 1006r Server Hardware Installation
on page 25
on page 27
Installing a High Availability system
Review the "Installing the Avaya CallPilot server" section in the
Installation and Configuration Task List (NN44200-306), and
completed stage 1 of the "Installation checklist."
Installing the server
Description
on page 29 When you
on page 30
Check
December 2010
25

Advertisement

Table of Contents
loading

Table of Contents