3
1
2
BELT DRIVE
2. Install:
clutch carrier nut
•
TIP
While holding the clutch carrier with the rotor
holding tool
2
the locknut wrench
1
Rotor holding tool
90890-01235
Locknut wrench
90890-01348 (YM-01348)
3. Install:
clutch housing
•
secondary sheave nut
•
3
TIP
Tighten the secondary sheave nut with the
rotor holding tool
2
Rotor holding tool
90890-01235
4.
Position:
3
V-belt
•
TIP
Position the V-belt in the primary sheave
(when the pulley is at its widest position) and in
the secondary sheave
its narrowest position), and make sure the V-
belt is tight.
1
4-43
ENG
1
1
90 Nm (9.0 m • kg, 65.1 ft • lb)
, tighten the clutch carrier nut with
2
2
.
3
3
1
1
2
2
55 Nm (5.5 m • kg, 39.8 ft • lb)
.
3
1
(when the pulley is at
3
2