Oce BLM 500 Operating Information Manual page 42

Hide thumbs Also See for BLM 500:
Table of Contents

Advertisement

Lift the Booklet maker Main Deck
[19]
Step
1
2
3
4
5
42
Chapter 4 Standard Tasks
Action
Open the connecting bridge
cover.
Open the folder cover.
Lift the clincher frame.
Open the gathering area cover.
Lift the Booklet maker main
deck.
Information
(see 'Open the Connecting Bridge
Cover' on page
36)
(see 'Open the Connecting Bridge
Cover' on page
36)
(see 'Lift the Clincher Frame' on
page
39)
(see 'Lower the Clincher Frame'
on page
39)
The main deck lifts to
approximately 60º. The weight of
the main deck is supported by a gas
strut. Let the gas strut control the
movement of the main deck.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bookletmaker 50

Table of Contents