Rack Installation Kit Assembly; Unpacking The Rack Installation Kit - NEC SA2500 User Manual

Table of Contents

Advertisement

User Guide

Rack Installation Kit Assembly

This section provides the assembly instructions for mounting the server into a standard
19-inch rack cabinet.

Unpacking the Rack Installation Kit

Although the rack installation kit is inspected and carefully packaged at the factory,
damage may occur during shipping. Follow these steps for unpacking.
1. Visually inspect the shipping containers; notify your carrier immediately of
any damage.
2. Carefully remove the rack mounting hardware and verify the parts.
■ Support rail assembly front and rear part (left side)
■ Support rail assembly front and rear part (right side)
■ Support rail assemblies fixing screws
■ Rack mounting frame (A in figure 4)
■ Handles (2 pieces, A in figure 1 below)
■ Handles fixing screws (4 pieces, B in figure 1 below)
■ Hex key for frame grubscrews (C in figure 1 below)
3. If parts are missing or the hardware is damaged, notify your server
representative.
Figure 8: Handles, screws and hex key
74
www.nec-computers.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wa2500

Table of Contents