Setup Before Departure; Update Chart Material; Display And Approve Dates For S57 Charts And Manual Updates; Creating Or Updating User Chart - Furuno FEA-2107-BB Operator's Manual

Electronic chart display and information system (ecdis)
Hide thumbs Also See for FEA-2107-BB:
Table of Contents

Advertisement

6.

Setup Before Departure

6.1

Update Chart Material

Update your ARCS and S57 chart material before embarking on a new voyage. To get more information about
updating ARCS charts, see Chapter 9 Raster Chart Material. For information about updating S57 charts, see section
8.2 S57 Charts.
6.2
Display and Approve Dates for S57 Charts and
Manual Updates
Note: It is very important that you set the Display and Approve dates for S57 charts as the current date.
There may be features which require chart viewing dates or seasonal dates in S57 charts. Accordingly, if you have
not set Display and Approve dates as the current date there is a possibility that you may get a wrong presentation or
some feature may be absent. For how to set Display and Approve dates, see section 8.12 Chart Viewing Dates and
Seasonal Features of the Vector Chart.
6.3

Creating or Updating User Chart

If necessary, create a new user chart or modify an existing one. For more information about user charts, see Chapter
15 User Chart Control.
6.4

Creating or Updating Pilot Data

If necessary, create a new pilot data or modify an existing one. For more information about pilot data, see Chapter
16 Pilot Data.
6-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fea-2107Fea-2807

Table of Contents