Set Up Before Departure; Updates Before Departure - Furuno FCR-2119-BB Operation Manual

Chart radar
Hide thumbs Also See for FCR-2119-BB:
Table of Contents

Advertisement

6. CHART OVERVIEW
5. For automatic input, follow the procedure below. For manual input, go to
step 6.
1) Check [Sensors].
2) For local system settings, set the priority for each sensor connected, referring
to section 6.14.
3) Go to step 7.
Note: For the local sensor, an offset can be applied to the gyro reading if it is
wrong. Check [Gyro Correction], then spin the scrollwheel to set the offset.
6. For manual input, check [Manual]. Enter the heading using the scrollwheel, the
software keyboard or the keyboard on the Control Unit.
7. Click the [Save] button to save settings then click the [Close] button to close the
menu.
6.16

Set up Before Departure

6.16.1

Updates before departure

Update S57 chart material
Update your S57 chart material before embarking on a new voyage. See section 7.20.
Display date and update review dates for S57 charts and manual updates
Note: It is very important that you set the Display and Update Review dates for charts
as the current date.
There may be features that require chart viewing dates or seasonal dates in charts.
Accordingly, if you have not set Display date and Update Review dates as the current
date, there is a possibility that you can get a wrong presentation or some feature may
be absent. See section 9.2.
Create or update user chart, Notes
If necessary, create a new user chart and Notes or modify existing ones. See
chapter 13.
Chart alert calculation
Set chart alert areas suitable for your coming voyage, on the [Look-ahead] page in the
[Overlay/NAV Tools] box. See section 11.2.
6-30

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents