9. Gently press down on the top of the heat sink to counteract the pressure of the
captive spring-loaded screws, and use a #2 torque screwdriver to alternately
tighten each screw, 180 degrees at a time, until tight at 8 inch pounds. See
, [5].

FIGURE 3-12

Step 1
10. Repeat
through
[6].

11. Return the server module to operation.

a. Install the server module top cover.
See
Section 4.1, "Installing the Server Module Top Cover" on page
b. Insert the server module into the Sun Blade chassis.
See
Section 4.2, "Reinstalling the Server Module in the Sun Blade Chassis" on
page
4-3.
c. Power on the server module.
See
Section 4.3, "Powering On the Server Module" on page
12. Update the BIOS and firmware.
Refer to the corresponding ILOM supplement.
Step 9
until all processors are installed. See
Chapter 3
Servicing Server Module Components
,
FIGURE 3-12
4-2.
4-4.
3-23