6
Lifting by Crane
* Crane operations and slinging work should be performed by qualified
operators.
* Use lifting wire ropes and shackles with sufficient strength to hold the weight of
the machine.
* Carefully consider the machine's center of gravity and balance while lifting.
Use installed four hoisting lugs to securely sling the machine and maintain horizontal balance
when lifting.
machine weight : 490kg
5317M-0606-020
Operation