Buell X1 2002 Service Manual page 128

Hide thumbs Also See for X1 2002:
Table of Contents

Advertisement

HOME
6855
Figure 2-93. Throttle Cable/Handlebar Routing
5.
Route idle and throttle control cables.
a.
See
Figure 2-93.
from throttle control grip, forward of upper triple
clamp and to the left.
b.
See
Figure 2-94.
Continue between the left side of
frame steering head and left frame tube. Cables
should be above and to the left of the D-shaped
washer behind the steering head.
c.
See
Figure 2-95.
Route cables below the fuel tank
and continue downward.
6.
Attach throttle cables to throttle body and adjust. See
1.20 THROTTLE
CABLES.
See
Figure 2-96.
Attach throttle cable clamp to fer-
rules with screw (arrow on clamp points up).
7.
Install air cleaner assembly. See
2-60
Cables must be routed forward
4.42 AIR
CLEANER.
7058
Cables (behind wir-
ing harness)
Figure 2-94. Steering Neck Routing
6856
Figure 2-95. Throttle Body Routing
8204
Screw
Arrow (Up)
Figure 2-96. Throttle Cable Clamps
Throttle Cable
Clamps
2002 Buell X1: Chassis

Advertisement

Table of Contents
loading

Table of Contents