CANISTER
3
2
7 Nm (0.7 m
kg, 5.1 ft
•
Order
Removing the canister
1
Canister
2
Rollover valve
3
Fuel tank to rollover valve hose
4
Rollover valve to canister hose
5
Canister to throttle body hose
4
Ib)
•
1
Job/Part
7 - 41
CANISTER
Q'ty
Remarks
Remove the parts in the order listed.
1
1
1
1
1
For installation, reverse the removal pro-
cedure.
FI
5