Enabling Multi-Panel Operation - FOR-A MFR-1616 Operation Manual

Multi format routing switcher
Hide thumbs Also See for MFR-1616:
Table of Contents

Advertisement

5-8-2. Enabling Multi-Panel Operation

Multi-panel operation can be enabled in the Setup menu or in the [Web-based Control: RU
Settings page].
The procedure to enable multi-panel operation in the Setup menu is as shown below.
(Supported only by MFR-39RU)
Step
1
Press the SETUP button to open the Setup menu.
Turn the control knob to select RU CONN ID, and press the knob to confirm.
2
Turn the control knob to select the ID, and press the knob to confirm.
ID:
This ID is used to synchronize remote control panels for multi-panel operation. All
3
panels must have the same ID as the unit ID of the master remote control panel of the
system.
(ex.) To enable multi-panel operation using a master remote control panel whose unit
ID is 100, set the ID as 100 for all integrated remote control panels.
Press the CANCEL button to return the menu display to select menus. Turn the control
knob to select RU CONNECT, and press the knob to confirm.
4
5
Turn the control knob to select ON, and press the knob to confirm.
Perform the above procedure for each remote control panel to be integrated.
To enable multi-panel operation in Web-based Control, proceed as follows:
(1) Click the remote control unit for setting to display the menu tree. Select RU Settings to
display the menu.
(2) Set the master remote control unit using Unit ID under Master ID (for RU Linkage).
(3) Set RU Linkage to ON.
Description
SETUP>RU CONN ID
UNIT ID: 0<ENT>
Menu display
SETUP>RU CONNECT
ENABLE:OFF<ENT>
Menu display
70

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents