Husqvarna TE 250 - 310 2011 I.E. Workshop Manual page 84

Hide thumbs Also See for TE 250 - 310 2011 I.E.:
Table of Contents

Advertisement

1
2
4
5
3
GENERAL PROCEDURES
-
Disconnect connectors (1) and (2) and MAQS connector (3) from the throttle
body (4).
-
Loosen the clamps (5) and (6).
-
Push the intake coupling (7) towards the rear end of the motorcycle to re-
7
lease the throttle body (4) and then extract it from the right-hand side of the
motorcycle.
6
H02228
H02227
-
Place a vessel on the left-hand side of the cylinder, under the engine.
-
Slacken the radiator cap (8).
8
H02229
E.22
Ed. 07-2010

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tc 250 2011Tc 250i 2011 i.e. usa

Table of Contents