Gear Shift And Kick Start Pedal Installation - Husqvarna TE 250 - 310 2011 I.E. Workshop Manual

Hide thumbs Also See for TE 250 - 310 2011 I.E.:
Table of Contents

Advertisement

ENGINE REASSEMBLY

Gear shift and kick start pedal installation

Install the gear shift pedal (1) and tighten the screw (2) using an 8 mm wrench
(8 Nm, 0.8 Kgm, 5.8 ft/lb).
Check the pedal (1) for damage.
Refit the kick start pedal (3) and tighten the screw (4) using a 12 mm wrench
(25 Nm, 2.5 Kgm, 18.44 ft/lb + Loctite 272). Make sure that the pedal does not
foul the cover.
H.54
Ed. 07-2010

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tc 250 2011Tc 250i 2011 i.e. usa

Table of Contents