Primary Drive Sprocket Removal - Husqvarna CR 65 2012 Workshop Manual

Table of Contents

Advertisement

5
3
Workshop Manual Ed. 09-2011
ENGINE DISASSEMBLY
CR 65 2012
– Remove the plate pack (2) from the clutch housing.
2
WARNING: The plate pack consists of lined and steel plates, compression springs,
spring retaining plate with screws, pressure plate and hub.
If no repairing is required on the plate pack, then you do not need to continue
disassembling.
– Slide out the thrust washer from the input shaft, the clutch housing, the sup-
porting bushing (3) and the thrust washer (4) placed behind.
– Remove the starting idle gear (5).
4

Primary drive sprocket removal

– Place the retaining tool (6) for the primary drive sprocket and loosen the
hexagon nut.
TO LOOSEN THE HEXAGON NUT OF THE PRIMARY DRIVE SPROCK-
ET, THE PRIMARY DRIVE MUST NOT BE BLOCKED WITH A SECTOR
GEAR OR ALIKE. THAT WOULD DAMAGE THE CRANKSHAFT.
– Remove the retaining tool, the hexagon nut, the lock washer and the primary
6
drive sprocket from the crankshaft.
– Use the puller to remove the gear from the crankshaft.
F.6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents