Components that are handled as Field Replaceable Units
– Processor (replacement)
– SAS / SATA backplanes
– Power backplane
– Front panel module
– Management and diagnostics modules
– System board
– Standard power supply unit
– Trusted Platform Module (TPM)
– USB Flash Module (UFM)
2.2

Average task duration

Hardware: 10 minutes
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
Refer to the following table for an overview of steps taken into account for
calculating the average task duration:
Step
Server shutdown
Rack removal,
disassembly
Transport
Table 1: Calculation of the average task duration
TX2540 M1
included
Explanation
Shutdown time depends on hardware and
software configuration and may vary
significantly.
no
Software tasks necessary before
maintenance are described in section
"Starting the maintenance task" on
page
Making the server available, removing the
yes
server from the rack (if applicable)
Transporting the server to the service table
no
(where required) depends on local
customer conditions.
Upgrade and Maintenance Manual
77".
Before you start
27