Performing Usps Meter Inspection; At A Pc Using Pc Meter Connect™ (Enhanced Version); At Mailing Machine - Pitney Bowes DM100i Operator's Manual

Hide thumbs Also See for DM100i:
Table of Contents

Advertisement

6 • Adding Postage/Connecting to Data Center

Performing USPS Meter Inspection

At a PC Using PC Meter Connect™ (Enhanced Version)
Select the Updates tab, then click on "Perform Meter Inspection" Af-
ter several moments, a Meter Inspection Completed screen displays.
Click OK.

At Mailing Machine

Even though this procedure is the same as checking your Postage By
Phone account balance, it satisfies the USPS
1. Make sure your machine can make connection to the Data Center.
2. Press Add Postage.
3. Select "Check PBP balance".
ADD POSTAGE TO METER
◄Add $xx
◄Add another amount
◄Check PBP balance
4. The system connects to the Pitney Bowes Data Center (this may
take a few moments). Various screens displays, letting you know
the status of the process.
5. The Prepaid and Other balances displays. Press No.
PBP Balance
Prepaid
Other
Add postage? (yes or no)
If there are no updates for your system, you will return to the
Home screen. If there are updates available, the display notifies
you of this fact.
6-14
$xxx
$xxx
inspection requirements.
®
SV62276 Rev. C

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dm225Dm125Dm200l

Table of Contents