Installing The Yoke - High End Systems Cyberlight 2.0 User Manual

Table of Contents

Advertisement

Installing the Yoke

Although you can operate the Cyberlight 2.0 fixture
standing on it's handles, you
the supplied yoke for truss mounting.
Yoke kit components:
• two 5/16 inch carriage bolts
• two clamping T-handles
• yoke
• two 3/8 inch allen cap screws
• two 9/16 inch locknuts (nut with nylon insert)
Installing the yoke:
Note:
If you are installing this yoke on a
fixture that has already been put into
use, disconnect the unit from power
and allow at least 10 minutes to cool.
1. To assemble the yoke, insert the carriage bolts through
the square-shaped hole in the yoke and loosely attach the
clamping T-handles to the carriage bolts.
2. Remove the center access door and stand the fixture on its
end handles.
3. Position the U-shape of the yoke is opposite the center
access door, aligning the bottom holes on the yoke with
the yoke pivot hole.
4. Insert the two 3/8 inch allen bolts through the round holes
in each side of the yoke, and through the holes in the side
of the Cyberlight 2.0. Tighten them using your fingers or
an allen wrench.
5. Place a locknut on the end of each allen bolt. You can use
either a 3/8 inch socket wrench or a 3/8 inch wrench to
turn the nut. Tighten the nut until so you are still able to
pivot the fixture.
6. Position the yoke as desired, using the deviation degree
markings on the yoke for exact positioning, and firmly
tighten the T-handles.
7. On the top of each yoke are three 13 mm (1/2-inch)
diameter mounting holes which provide two different ways
to mount the fixture.
Cyberlight
2.0 User Manual
®
will need to install
Clamping
T-Handle
5/16 in
carriage
bolts
9/16 inch
locknuts
3/8 inch
allen bolts –
insert through yoke
and into fixture
CHAPTER 2
Installation and Setup
Yoke
Clamping
T-handle
Yoke
tilt plate
T-handle
9

Advertisement

Table of Contents
loading

Table of Contents