14. When the proper float height is obtained,
carefully install the new O-Rings for the fuel
bowl and transfer passage (if so equipped). See
Figure 5-24.
15. Install the fuel bowl onto the carburetor. Secure
with the four original screws. Torque the screws
to 2.5 ± 0.3 N·m (23 ± 2.6 in. lb.). See Figure 5-25.
16. Install the new cover gasket and top cover on the
carburetor. Secure with the two large-head screws
and attach the ground lead (if equipped with
a fuel solenoid), to the original screw location.
Torque the top cover screws to
2.5 ± 0.3 N·m (23 ± 2.6 in. lb.).
17. Place the longer new spring onto the idle fuel
adjusting screw and install it into the carburetor.
As an initial adjustment, set to 1 turn out from
lightly seated. See Figure 5-26.
18. Place the shorter new spring onto the idle speed
adjusting screw and install it into the carburetor.
Thread in until 3 or 4 threads are exposed, as an
initial adjustment. See Figure 5-27.