Rotax 912 Series Installation Manual page 117

912 series
Hide thumbs Also See for 912 Series:
Table of Contents

Advertisement

Requirements for correct operation of the integrated rectifier-regulator:
(A)
50
40
30
20
10
00547
Fig. 78
Effectivity: 912 Series
Edition 1 / Rev. 0
BRP-Rotax
INSTALLATION MANUAL
-
the rectifier-regulator has to be protected by a slow blowing fuse or
circuit breaker. Fuse or circuit breaker rating must be determined by
load, wire size and length.
-
cross section of the main circuit at least 4 mm
-
a capacitor (Fig. 67 Pos. (14)) of at least 22 000 µF / 25 V is
necessary to flatten voltage.
-
current:
■ CAUTION:
The current over speed graph has been determined
and is effective only at the following conditions:
ambient temperature:
voltage:
tolerance:
◆ NOTE:
The speed of the auxiliary generator is 1,24 or 1,32
times crankshaft speed or 3 times the prop speed.
1000
1500
2000
3000
4000
2000
2500
5000
6000
7000
2
(10 AWG)
20 °C (68 °F)
permanent 13,5 V
± 5%
1/min. / rpm.
n Propeller
rpm. propeller
8000
n Generator
rpm. alternator
page 117
May 01/2007

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

912 uls 3

Table of Contents