Establishing A Point To Point Connection - LightSand S-2500B Installation And User Manual

Table of Contents

Advertisement

Establishing a Point to Point Connection

A logical channel runs from a termination point (TP) on one gateway to a TP on another
gateway in the network. The only type of TP currently supported is Packet Over SONET
(POS). The S-2500B Gateway supports only one POS TP on the SONET port.
Create a channel (a point to point connection) between the new node and another gateway
using the example below as a guide. For more information refer to
Point (page A-15)
in the CLI appendix.
To establish a point to point connection:
Create a physical link by attaching a cable between the WAN 1 ports on the two gateways.
1.
Configure the WAN 1 port on each gateway to be a SONET port.
2.
On each gateway configure a POS TP on the SONET port:
3.
gateway:> config tp pos 1
View the commands available for configuring the TP:
4.
gateway/config/tp/pos/1# ?
Sub-Context: ip
Cur-Context:
create <time-slot> <payload-type>
delete
name <tp-name>
description <tp-descr>
admin-status <admin-status>
credit-grant-threshold <credit-grant-threshold>
credit-grant-period <credit-grant-period>
init-round-trip-delay
Create the TP, for example with ch-c timeslot and FC payload:
5.
gateway/config/tp/pos/1# create ch-c fc
(The CLI then prompts for entry of additional parameters.)
Configure an FC port:
6.
gateway:> config port efc 1 type fc
System Configuration
Configure a Termination
3-5

Advertisement

Table of Contents
loading

Table of Contents