Kipor Sinemaster IG200 Operation Manual page 19

Digital inverter generator
Table of Contents

Advertisement

9. MAINTENANCE
The purpose of the maintenance and adjustment schedule is to keep the generator in
the best operating condition.
Inspect or service as scheduled in the table below.
WARNING
Shut off the engine before performing any maintenance. If the engine must be
run, make sure the area is well ventilated. The exhaust contains poisonous
carbon monoxide gas.
CAUTION
Use genuine our parts or their equivalent. The use of replacement parts which
are not of equivalent quality may damage the generator.
Maintenance Schedule
REGULAR SERVICE PERIOD(3)
ITEM
EACH
Perform at every indicated month
USE
or operating hour interval, which-
ever comes first.
Check level
Engine oil
Change
Check
Air cleaner
Clean
Check-adjust
Spark plug
Replace
Valve clearance
Check-adjust
Fuel tank and filter
Clean
Every 2 years (Replace if necessary) (2)
Fuel line
Check
NOTE: (1) Service more frequently when used in dusty areas.
(2) These items should be serviced by your servicing dealer, unless you have the proper tools and
are mechanically proficient. Refer to shop manual for service procedures.
(3) For commercial use, log hours of operation to determine proper maintenance intervals.
FIRST
EVERY 3
EVERY 6
EVERY
MONTH
MONTHS
MONTHS
YEAR
OR
OR
OR
OR
20HRS
50HRS
100 HRS
200 HRS
(1)
(2)
(2)
5.Move the choke handle to the RUN position after the engine warms up.
CHOKE
HANDLE
NOTE
If the engine stops and will not restart, check the engine oil level before
troubelshooting in other areas.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinemaster ig2000pSinemaster ig2000s

Table of Contents