66
Optional Equipment
Wiring Instructions
Warning:
All wiring should be done by a qualified electrician and shall be in compliance
with local codes and with the current National Electric Code ANSI/NFPA 70 (in the U.S.), or with
the current CSC22.1 Canadian Electric Code (in Canada).
Warning:
Make sure the fireplace electrical circuit is disabled prior to working on electrical
hookup.
Wiring Diagram -864TRV
1
Follow the directions below to wire the blower box.
a
Remove the cover from
the blower box.
Attach the hot (black) and common (white) wires to the
c
leads coming from the wires (use wire nuts).
Travis Industries
(for qualified installers only)
Junction Box
Hot
(black)
(black)
Common
Common
(white)
(white)
Ground
Ground
(green)
(green)
Phillips
Screwdriver
Secure the ground wire to the ground stud inside the
d
blower box by tightening the included nut over the
ground wire. Re-attach the cover removed in step
"a".
4050714
Rheostat
Hot
b
Insert sheathed cable through the cable clamp.
After the wires have been connected tighten the
clamp to secure the cable.
Ground Wire
Blower
Assembly
Standard
Screwdriver
100-01173_001