Bedknife Replacement And Grinding - Toro Reelmaster 5210 Service Manual

Hide thumbs Also See for Reelmaster 5210:
Table of Contents

Advertisement

Bedknife Replacement and Grinding

Bedknife Removal
1. Remove bedbar from cutting unit (see Bedbar Re-
moval in this section).
2. Remove screws from bedbar using a socket wrench
and bedknife screw tool (see Special Tools). Discard
screws. Remove bedknife from the bedbar (Fig. 23).
Bedknife Installation
1. Use scraper to remove all rust, scale and corrosion
from bedbar surface and lightly oil surface before instal-
ling bedknife.
2. Make
sure
that
screw
(5/16--18UNC--2A) are clean. Apply antiseize lubricant
to the threads of new screws. Take care to keep anti-
seize lubricant from taper on screw heads.
IMPORTANT: Do not use an impact wrench to tight-
en screws into the bedbar.
3. Use new screws to secure bedknife to bedbar. Install
all screws but do not tighten fully. Then, using a torque
wrench and bedknife screw tool, torque screws from
200 to 250 in- -lb (23 to 28 N- -m). Use a torquing pattern
working from the center toward each end of the bedknife
(Fig. 24).
4. After installing bedknife to bedbar, grind bedknife.
Bedknife Grinding
Since there can be variations in the mounting surface of
the bedbar, a new bedknife will not be perfectly flat after
it is installed to the bedbar. Because of this, it is neces-
sary to grind a new bedknife after installing it to the bed-
bar. Follow the existing angle that was ground into the
bedknife and grind only enough to make sure the top
surface of the bedknife is true (Fig. 25).
NOTE: When grinding the bedknife, be careful to not
overheat the bedknife. Remove small amounts of mate-
rial with each pass of the grinder. Also, clean and dress
grinding stone often during the grinding process.
1. Use Toro General Service Training Book, Reel
Mower Basics (part no. 09168SL) and grinder
manufacturer's instructions for bedknife grinding in-
formation.
Bedknife Grinding Specifications (see Fig. 25)
Bedknife Relief Angle
Bedknife Front Angle
Cutting Units (Rev. C)
threads
in
bedbar
o
o
3
to 7
o
o
3
to 7
Page 7 - - 20
2. After grinding bedknife, check lead--in chamfer on
bedknife (see Cutting Unit Operator's Manual).
3. After bedknife grinding is complete, install bedbar to
cutting unit (see Bedbar Installation in this section).
3
Antiseize
Lubricant
200 to 250 in- -lb
(23 to 28 N- -m)
Figure 23
1. Screw (8 used)
2. Bedbar
7
5
3
1
Figure 24
Relief Angle
Figure 25
2
Lightly Oil
1
Bedbar Surface
3. Bedknife
2
4
6
8
Top Face
Remove
Burr
Front
Face
Front Angle
Reelmaster 5010 Series

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reelmaster 5410Reelmaster 5510Reelmaster 5610

Table of Contents